Two of our earliest customers placed a repeat order within two years of their first installation. That pattern has held since 1998, across pharma, chemicals, metals, coatings and the public sector.

A flue gas desulphurisation scrubbing system rated at 165,000 Am³/h, delivered as part of an EPC package — the same rating as our largest executed blower.
From the first engineered packed bed in 1998 to a nuclear-grade exhaust stack in 2022.
The system installation and commissioning has turned out indistinguishable from the approved models. Bhavi Plast has the competence and capability to execute such projects as a single point responsibility.
We are extremely happy with the turnkey local exhaust and air pollution control system supplied by them, and would recommend them for their domain knowledge and expertise.
We are satisfied with the design capability, manufacturing setup and the quality of installation and commissioning services provided by Bhavi Plast.
Send the process data and the layout constraint, and we will come back with a sized proposal.
Choose the equipment you need. We will take three details, then send you the enquiry data sheet for that product — the one our engineers use to size and quote.

FRP and dual-laminate process equipment, engineered, built, installed and maintained under one contract. Established 1977.